The Cape Breton Partnership has commissioned DMDE Engineering Limited to carry out a high-level conceptual study to investigate the potential of a green cement manufacturing plant in Strait of Canso, Unama’ki – Cape Breton, Nova Scotia.
The intent of this study is to determine the feasibility and to identify the advantages of this location for establishing the plant, and the study includes details on the Strait of Canso region and port capabilities; proposed site location and characteristics; local limestone deposit; fly ash availability; rail transportation; port infrastructure; market demands; and more.
Read the study here: Conceptual Study: Green Cement Manufacturing Facility – Strait of Canso, Nova Scotia – Cape Breton Partnership